§ 74-514. High risk operation and hotspot requirements.
In addition to the provisions of this article, developments and redevelopments that meet the definition of high risk operation or hotspot shall meet the following criteria:
(a)
No portion of the area of risk shall bypass the stormwater management system;
(b)
At a minimum, treatment method must be as specified in the Georgia Stormwater Management Manual and be designed for the specific pollutant of risk; and
(c)
The commissioner may, at his discretion, create additional and specific policies regarding these types of operations.
(Ord. No. 2004-56, §§ 2—4, 9-15-04; Ord. No. 2013-05(12-O-1761), § 12, 2-13-13)