§ 154-67.1. Rates associated with private water main and fire hydrant installation.  


Latest version.
  • (a)

    The nonrefundable fee of $1,000.00 is due at the time of application to cover the initial review of all private water main and fire hydrant installation design proposals. The total cost for design review, inspection, testing, chlorination, and engineering and documentation shall be determined according to the schedule set forth in subsection (b) and shall be paid at the time of the pre-construction conference.

    (b)

    The charges for chlorination, inspection, and testing the associated documentation shall be according to the established table for a minimum of 500 feet of ductile iron pipe to be installed according to the design criteria of the department of watershed management.

    RATES ASSOCIATED WITH PRIVATE WATER MAIN AND FIRE HYDRANT INSTALLATION
    TABLE OF COSTS PER 500 FEET (MINIMUM) LENGTH OF PIPE TO BE INSTALLED
    FROM MAIN COCK TO MAIN COCK:

    Water Main Size 8" 12" 16" 20" 24"
    Review $1,590.00 $2,170.00 $2,515.00 $3,950.00 $4,415.00
    Inspection & Testing 955.00 1,300.00 1,510.00 2,370.00 2,650.00
    Chlorination 285.00 500.00 640.00 850.00 1,135.00
    Engineering & Documentation 320.00 435.00 505.00 790.00 885.00
    Total 3,150.00 4,405.00 5,170.00 7,960.00 9,085.00

     

    TABLE OF COSTS PER 500 FEET (MINIMUM) LENGTH OF PIPE TO BE INSTALLED FROM MAIN COCK TO FIRE HYDRANT:

    Water Main Size 8" 12" 16" 20" 24"
    Review $1,590.00 $2,170.00 $2,515.00 $3,950.00 $4,415.00
    Inspection & Testing 955.00 1,300.00 1,510.00 2,370.00 2,650.00
    Chlorination 215.00 320.00 465.00 640.00 815.00
    Engineering & Documentation 320.00 435.00 505.00 790.00 885.00
    Total 3,080.00 4,225.00 4,995.00 7,750.00 8,765.00

     

    (c)

    All fees are due and payable not less than 15 working days prior to commencement of actual construction.

(Ord. No. 1996-61, §§ 1—3, 8-26-96; Ord. No. 2005-01, §§ 11, 12(Att. D), 1-10-05; Ord. No. 2006-53, § 25, 8-29-06)